Mungi Spurlines, Moura

Value:              $1-$2 million

Year:                2010

Client:             Molopo Energy Limited

Scope:            Engineering, Supply, installation, testing and commissioning of 4.3km of gas gathering systems for the Molopo Energy Mungi Spurline, 5km east of Moura, QLD. The project included assisting the client to take the project from basic engineering through to execution phase. Limited information was known about the locations of the existing networks and services within the area with extensive research, locating and potholing completed to positively locate the services. The installation also included a 1000mm diameter carrier pipe underbore of the Dawson Hwy and adjoining railway line totalling 150m in length. The on-site early works began on the 5th of July 2010, with the main body of work beginning on the 19th of July with a 1 month completion.

 Key Features

  • No lost-time injuries (LTI) or medically treated injuries (MTI)
  • 4.3km installation of gas gathering network crossing numerous services and existing gas gathering networks
  • 150m underbore under road, rail and electrical corridor
  • Front-end engineering and constructability assistance
  • Procurement of all major materials and sub-contracts
  • Pigging and purging of gas line.
Welding Gas and Water Pipes